Civil

Civil Tenders

S.No. Tender Ref. No. Title Details Downloads Notices
News paper
Advert.
NIT General Addendum Opening of
Financial Proposal
Notice of
award
1 AGTS-02 lmrc tendersEngagement of Survey team for Topographical Survey work to facilitate planning works and routine survey works in Agra Metro Rail Project of Uttar Pradesh Metro Rail Corporation Ltd. More info
2 LKGS-01 lmrc tendersDetailed Geo-Technical Survey of East-West Corridor (Charbagh to Vasantkunj) including Depot at Hardoi Road for Lucknow Metro Rail Project Phase 1B. More info
3 LKTS-01 Detailed Topographical Survey of East-West Corridor (Charbagh to Vasantkunj) including Depot at Hardoi Road and Alignment Design of Main Line and Depot Entry-Exit Line for Lucknow Metro Rail Project Phase 1B. More info
4 LKCC-15 Design and Construction of Multi storied RCC Framed Metro Bhawan cum OCC Building including Structural, Architectural Finishing, Plumbing, Drainage, External Development, Road Works, E & M Works, HVAC, Fire Detection and Fire Fighting etc. near Sachivalaya underground metro station, Lucknow More info
5 AGCC-07 Design and Construction of Main Line Elevated Viaduct from Agra Cantt. Metro Station to Kalindi Vihar Metro Station [Chainage (-77m) to 15016m] including Viaduct Connection with Ramp (Chainage 0.00m to 2610m) from (nearby) Sadar Bazar Metro Station to existing Corridor-1 Depot at PAC ground & Corridor-2 Depot Entry/Exit lines Viaduct with Ramp (Chainage 0.00m to 530m) and 14 nos. of Elevated Stations i.e., Agra Cantt, Sadar Bazar, Pratap Pura, Collectorate, Agra College, Hariparvat Chauraha, Sanjay Place, M.G. Road, Sultanganj crossing, Kamla Nagar, Ram Bagh, Foundary Nagar, Agra Mandi & Kalindi Vihar metro stations including Civil, Associated Ancillary Structures, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E&M works and PEB structures in Corridor-2 of Agra Metro at Agra, Uttar Pradesh, India More info
6 KNPCC-14 Civil, PEB and E&M works for construction of depot cum workshop, including structural, architectural, plumbing, drainage, external development, road works, electrical, mechanical, VAC, fire fighting, fire detection etc. at Agricultural University Kanpur for Agricultural University to Barra-8 Corridor-2 of Kanpur Metro More info
7 KNPCC-12 Design and Construction of elevated viaduct and 5 Nos. elevated stations (viz. Agriculture University Station, Vijay Nagar Chauraha Station, Shastri Chowk Station, Barra-7 Station & Barra-8 Station) including Architectural Finishing, E&M work and special spans from end of ramp after Double Pulia Station to Barra-8 Station i.e., from chainage 3783.000m to 7528.566m and end of ramp in Depot to Agriculture University Station i.e., from chainage (-)297.460m to (-)855.339 on Corridor-2 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India. More info
8 AGCC-05 Design and Construction of elevated viaduct and 3 Nos. elevated stations (viz. ISBT, Guru Ka Taal & Sikandara Metro Station) including Civil, Associated Ancillary Structure, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E&M works and PEB structures on Balance Section chainage (-) 42.96 m to 3682.941 m of Corridor-1 of Agra Metro at Agra, Uttar Pradesh, India. More info
9 AGKNPSG-01 lmrc tendersManufacturing, Supply, Installation, Testing and Commissioning of Signage and Graphics for 06 Nos. of Elevated Stations, 07 Nos. of Underground Stations and 01 No. Depot from Sikandra to Taj East Gate (Agra MRTS-Corridor 1) for Agra Metro Rail Project and 5 Nos. of Elevated Stations, 07 Nos. of Underground Stations from Chunniganj Station to Naubasta Station (Kanpur MRTS-Corridor 1) for Kanpur Metro Rail Project More info
10 KNPCC-13 Construction of lift shafts at three metro stations i.e., Kalyanpur, SPM and Vishwavidhyalaya at gate no. 2, roof sheeting and finishing works for Geeta Nagar and Motijheel Metro Stations and Miscellaneous remaining Civil works of priority corridor of Kanpur Metro Project at Kanpur, Uttar Pradesh, India More info
11 AGDSH-01 Interior Finishing works of Admin office, OCC, visitor’s room in Workshop building; providing wardrobe and modular kitchen in Metro Quarters along with associated Civil & Electrical works in Metro Depot, Agra More info
12 AGCC-06 Construction of elevated viaduct and 07 Nos. elevated stations (viz. Agra Cantt, Sadar Bazar, Pratap Pura, Collectorate, Agra College, Hariparvat chauraha and Sanjay Place metro stations) including Civil, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E&M works and PEB structures of Corridor-2 of Agra Metro at Agra, Uttar Pradesh, India. More info
13 KNPCC-11 Design and Construction of TBM Tunnel, Cut & Cover Tunnel, ramp after Double Pullia, ramps in Agriculture Depot for main line and depot connections and three underground metro stations (viz. Rawatpur, Kakadeo and Double Pullia) including Architectural finishes etc. on Corridor-2 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India More info
14 KNPSG-01 lmrc tendersManufacturing, Supply, Installation, Testing and Commissioning of Signage and Graphics for 5 Nos. of Elevated Stations ,07 Nos. of Underground Stations from Chunniganj Station to Naubasta Station (Kanpur MRTS-corridor 1),05 Nos. of Elevated Stations, 03 Nos. of Underground Stations & 01 Depot from Agriculture University to Barra-8 (Kanpur MRTS- corridor 2) for Kanpur Metro Rail Project More info
15 AGSG 01 lmrc tendersManufacturing, Supply, Installation, Testing and Commissioning of Signage and Graphics for 06 Nos. of Elevated Stations, 07 Nos. of Underground Stations & 01 Depot from Sikandra to Taj East Gate (Agra MRTS-corridor 1) for Agra Metro Rail Project. More info
16 KNPAGDDC-01 KNPAGDDC-01: Engagement of Detailed Design Consultant (DDC) for Civil, Architectural and E & M Works for (a) Corridor-2 (from Agricultural University to Barra-8) of Kanpur Metro Rail Project, consisting of 4.19 Km elevated section with 04 elevated Stations & 4.41 Km underground section with 04 underground Stations and Car Maintenance Depot at Kanpur and (b) Corridor-2 (from Agra Cantt. to Kalindi Vihar) of Agra Metro Rail Project, consisting of 15.40 Km elevated section with 14 elevated Stations and Car Maintenance Depot at Agra. (Tender document can only be obtained on the websitehttps://etenders.gov.in/eprocure/app ) More info
17 KNPCC-10 Construction of Residential, Non- Residential and Institutional buildings at Polytechnic College Campus, Gurudev Chauraha, GT road, Kanpur and Multi Storied Officers Colony of Uttar Pradesh Metro Rail Corporation inside Kanpur Metro Depot, GT Road, Kanpur including Architectural finishes, Plumbing, Drainage, External Development and E&M works. (Tender document can only be obtained on the websitehttps://etenders.gov.in/eprocure/app ) More info
18 AGCC-04 (Tender document can only be obtained on the websitehttps://etenders.gov.in/eprocure/app ) Construction of Residential and Non-Residential Buildings including Architectural finishes, Plumbing, Drainage, External Development & E&M works at 15th Battalion, PAC campus, AGRA. More info
19 KNPHK-01 (On e-Tendering website https://eprocure.gov.in/eprocure/app ) KNPHK-01: Mechanized Cleaning and Housekeeping Works of Rolling Stock (Metro Trains), Depot and 09 Nos. Metro Stations from IITKanpur to Motijheel, of Uttar Pradesh Metro at Kanpur. ( Tender document can only be obtained on the website https://eprocure.gov.in/ eprocure/app ) More info
20 KNPCC-07 (Tender document can only be obtained on the website https://etenders.gov.in/eprocure/app) KNPCC-07: Construction of elevated viaduct and 5 Nos. elevated station (viz. Baradevi Station, Kidwai Nagar Station, Vasant Vihar Station, Baudh Nagar Station & Naubasta Station) including Architectural Finishing, E&M work and special span from end of ramp (after Transport Nagar Station) to Naubasta Station on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India. ( Tender document can only be obtained on the website https://etenders.gov.in/eprocure/app ) More info
21 AGCC-02 (Available on https://etenders.gov.in/eprocure/app) AGCC-02-Design and Construction of Tunnel from start of underground ramp (near Fatehabad Road Metro station) to end of ramp after RBS college Metro station including seven underground metro stations (viz. Taj Mahal, Agra Fort, Jama Masjid, S.N. Medical college, Agra college, Raja ki Mandi and RBS college) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Agra MRTS Project at Agra, Uttar Pradesh, India. (Available on https://etenders.gov.in/eprocure/app ) More info
22 KNPCC-06 (https://etenders.gov.in/eprocure/app) KNPCC-06 (Funded by EIB): Design and Construction of TBM Tunnel, Cut & Cover Tunnel, underground ramp from Kanpur Central end of Nayaganj station to elevated ramp after Transport Nagar and three underground metro stations (viz. Kanpur Central, Jhakarkatti and Transport Nagar) including Architectural finishes, E & M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India (Available on https://etenders.gov.in/eprocure/app ) More info
23 KNPCC-08 (https://etenders.gov.in/eprocure/app) KNPCC-08: Restoration work of road along the viaduct from IIT Kanpur Metro Station to Motijheel Metro Station. ( Available on e-tendering website https://etenders.gov.in/eprocure/app ) More info
24 KNPAGSG--01 Contract KNPAGSG-01: Manufacturing, Supplying, Installation, Testing and Commissioning of Signage and Graphics for 14 Nos. of Elevated Stations, 07 Nos. of Underground Stations & 01 Depot from IIT Kanpur Station to Naubasta Station (Kanpur MRTS- corridor 1), 04 Nos. of Elevated Stations & 04 Nos. of Underground Stations from Agriculture University to Barra-8 (Kanpur MRTS- corridor 2) for Kanpur Metro Rail Project and 06 Nos. of Elevated Stations, 07 Nos. of Underground Stations & 01 Depot from Sikandra to Taj East Gate (Agra MRTS-corridor 1) for Agra Metro Rail Project. More info
25 KNPAGT-3 KNPAGT-3: Design, Installation, Testing & Commissioning of Ballastless Track of Standard Gauge in 4 Corridors in Elevated as well as Underground Sections of Kanpur and Agra Metro Project along with supply of fastening systems and associated Ballasted/Ballastless Tracks in 4 Depots. More info
26 AGCC-03 AGCC-03: Civil, PEB and E&M works for construction of depot cum workshop, including O & M quarters & structural, architectural, plumbing, drainage, external development, road works, electrical, mechanical, VAC, fire fighting, fire detection etc. at PAC Depot for Taj East Gate to Sikandra Corridor-1 of Agra Metro More info
27 AGCC-01 AGCC-01: Construction of elevated viaduct and 3 Nos. elevated stations (viz. Taj East Gate, Basai & Fatehabad Road Metro Station) including Civil, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire Fighting, Fire Detection, E&M works and PEB structures on Priority Section of Corridor-1, Phase- I of Agra Metro at Agra, Uttar Pradesh, India. More info
28 KNPCC-05 KNPCC-05- Design and Construction of Tunnel from start of elevated ramp (after Moti Jheel Metro Station) to end of Nayaganj station including four underground metro stations (viz. Chunniganj, Naveen Market, Bada Chauraha and Nayaganj) and ramp including Architectural finishes, E&M, TVS, ECS etc. on Corridor-1 of Kanpur MRTS Project at Kanpur, Uttar Pradesh, India More info
29 LKCM-01 LKCM-01 Maintenance contract for civil works from CCS Airport to Munshipulia Metro Station and Transport Nagar Depot. More info
30 KNPCC-09 KNPCC - 09: Road widening & diversion work from IIT Kanpur to Motijheel along Metro Corridor. More info
31 KNPAGT-02 KNPAGT - 2: Supply of Standard Gauge UIC 60 Turnouts, Scissor Crossovers, Check Rails etc. for Kanpur and Agra Metro. More info
32 KNPCC-04 KNPCC-04: Civil, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire fighting, Fire detection, E&M works and PEB structures for Nine nos. Elevated metro stations (from IIT Kanpur to Motijheel Metro Station) on priority section of Kanpur Metro at Kanpur, Uttar Pradesh, India. More info
33 KNPAGT-1 KNPAGT - 1: Supply of 17,700 MT Head Hardened Rails (60 E1, IRS-T-12-2009, 1080 grade HH) for Kanpur and Agra Metro. More info
34 KNPAGT - 4 KNPAGT - 4: Supply of 1620 MT Rails (UIC 60 / 60 E1, IRS-T-12-2009, 880 grade, Class A) for Kanpur and Agra Metro. More info
35 LKTM-01 LKTM-01: Track Maintenance of Line- (CCS Airport to Munshipulia Metro Station) and Transport Nagar Depot More info
36 LKHT-01 LKHT-01- Maintenance of horticulture works at 21 stations, ramps, station entries, RSS at polytechnic, polytechnic chauraha, CCAP Lawn, Shaheed path & Central Median from CCS Airport to Munshipulia metro station. More info
37 KNPCC-03 Tender KNPCC-03: Civil, PEB and E&M works for construction of depot cum workshop, including structural, architectural, plumbing, drainage, external development, road works, electrical, mechanical, VAC, fire fighting, fire detection etc. at Govt. Polytechnic Depot for IIT Kanpur to Naubasta Corridor-1 of Kanpur Metro. More info
38 LKCC-13(R2) Tender LKCC-13(R2): Construction of Synthetic Hockey Surface (Turf) with other essential works at 10th PAC Battalion, Barabanki, U.P. More info
39 KNPCC-02(R1) Construction of elevated viaduct and 9 Nos. elevated station (viz. IIT Kanpur Station, Kalyanpur Railway Station, SPM Hospital Station, Kanpur University Station, Gurudev Chauraha Station, Geeta Nagar Station, Rawatpur Railway Station, Lala Lajpat Rai Hospital Station & Motijheel Station) including special span on Priority Section of Corridor-1, Phase-I of Kanpur Metro at Kanpur, Uttar Pradesh, India. More info
40 AGDD-01(R1) Engagement of Detailed Design Consultant (DDC) For Civil, Architectural, E&M, Traction and Power supply Works for Sikandra to Taj East Gate Corridor-1 of Proposed Agra Metro Project, Agra, Uttar Pradesh, India; Consisting of 6.569 Km Elevated Section with 06 Elevated Stations, Ramps, 7.681 Km Underground Section with 07 Underground Stations and Car Maintenance Depot. *Revised NIT uploaded.* More info
41 LKCC-13(R1) Construction of Synthetic Hockey Surface (Turf) with other essential works at 10th PAC Battalion, Barabanki, U.P. More info
42 AGCC-01 Construction of Boundary Wall and Land Development of Depot at PAC Depot for Sikandara to Taj East Gate Corridor of proposed Agra Metro Rail Project at Agra, Uttar Pradesh, India. More info
43 AGDD-01 Engagement of Detailed Design Consultant (DDC) For Civil, Architectural and E & M Works for Sikandra to Taj East Gate Corridor-1 of Proposed Agra Metro Project, Agra, Uttar Pradesh, India; Consisting of 6.35 Km Elevated Section with 07 Elevated Stations, Ramps, 7.65 Km Underground Section with 08 Underground Stations and Car Maintenance Depot. More info
44 MRDD-01 Engagement of Detailed Design Consultant (DDC) for Civil, Architectural and E&M Works for Shradhapuri Ph-2 to Jagriti Vihar Extension of Corridor-2 of proposed Meerut Metro Rail Project, Meerut, Uttar Pradesh, India; Consisting of 9.864 Km Elevated Section with 10 Elevated Stations, Ramps, 4.286 Km Underground Section with 03 Underground Stations and Car Maintenance Depot. More info
45 KNPCC-02 Tender KNPCC-02: Construction of elevated viaduct and 9 Nos. elevated station (viz. IIT Kanpur Station, Kalyanpur Railway Station, SPM Hospital Station, Kanpur University Station, Gurudev Chauraha Station, Geeta Nagar Station, Rawatpur Railway Station, Lala Lajpat Rai Hospital Station & Motijheel Station) including special span on Priority Section of Corridor-1, Phase-I of Kanpur Metro at Kanpur, Uttar Pradesh, India. More info
46 LKCC-14 Restoration work of road along the viaduct from CCS Airport to Transport Nagar metro station and K.D. Singh Stadium to Munshi Pulia metro station. More info
47 LKCC-13 Construction of Synthetic Hockey Surface (Turf) Ground including Re-laying of old turf with other essential works at 10th PAC Battalion, Barabanki, U.P. More info
48 LKSG-02 Manufacture, Supply, Installation, Testing and Commissioning of Signage and Graphics for Nine Elevated Stations (from K.D. Singh Babu Stadium Station To Munshipulia + Amausi Station) and four Underground Stations (Hussainganj, Sachivalaya, Hazratganj and CCS Airport Station) on N-S Corridor of Lucknow Metro Rail Project. More info
49 LKCC-08 Civil, Architectural Finishes, Water Supply, Sanitary Installation, Drainage, External Development, Fire fighting, Fire detection, E&M Works and PEB Structures for Nine nos. Elevated metro stations (eight stations from K.D. Singh Babu Stadium Station to Munshipulia Station and one Amausi Metro station) on North – South Corridor, Phase 1A of Lucknow Metro at Lucknow, Uttar Pradesh, India. More info