LUCKNOW METRO: TBM- GANGA ALSO REACHES HAZRATGANJ
Just about a month after TBM- Gomti (UP line) reached Hazratganj , the second TBM working on Down line has also reached below the MG Marg in Hazratganj. The total length of the 5.8m dia tunnel from Sachivalaya underground metro station to Hazratganj underground metro station on Down line is 783 m, out of which only 38 m now remains to be completed.
The tunneling in this stretch posed enormous technical challenge for LMRC officials as the route passes beneath some highly congested...Read more